
A civil airport for SF Express in Ezhou, Hubei
International Logistics Airport Construction and Management System
Value achievements

Construction objectives:
1. Integrate international advanced project management ideas, combine with domestic management habits and standards, respond to the national call for "energy conservation and environmental protection, avoid duplicate construction", and use information systems as carriers to achieve business management process oriented, business control process specific, and clear;
2. Through system data flow, form reports, assist in data analysis, achieve periodic project monitoring, and digitize the project execution process;
3. Cooperate with the BIM model to achieve information integration throughout the entire construction cycle, meeting the requirements of project management during the construction period and later BIM based operations. Provide information management experience for airport construction and truly achieve modern management.
Construction content:
In the stages of project approval, feasibility study, preliminary design, construction drawing design, Construction permit, quality and safety supervision, all intermediate acceptance, completion acceptance, industry acceptance, project post evaluation, etc., to achieve the management of progress, investment, quality, safety, environmental protection and other elements within the whole life cycle of survey, design, construction, supervision, equipment and material procurement, Simultaneously achieve the function of integrating planning progress and other information using BIM models.
Function Architecture
Related information
Demo video
Scheme manual
Star Case