Safety Monitoring & Management System

“Safety Monitoring & Management System”: Serving medium- and large-sized hydropower projects, the system intensively manages safety monitoring data of all units in different periods, and achieves professional data management and analysis service by developing unified standards on data storage and analysis. The system can be connected to the BIM platform to visualize the spatial distribution of data related to instrument burying and safety monitoring. It can also be connected to scientific research platforms to perform safety evaluation and pre-warning for engineering structures.

Value result

Leading application of BIM+ safety monitoring
It provides full-lifecycle management for monitoring devices, categorizes monitoring devices and instrument burying ledger;
It provides mobile patrol APP, supports off-line data import to replace traditional EXCEL import.

Key function

Safety Monitoring & Management System

Short demo film

There is currently no information to display
Please add data record on website background.

Program Manual

  • 2018INS_“数字工程”整体解决方案领跑者-形象手册

    Download

Star case

Baihetan Hydroelectric Power Station
Customer : Yunchuan Hydropower
Installation capacity : 1600WKW
Project time : 2019S-2011S
Applied Products : Public test and inspection platform system/four simultaneous/personnel positioning three-dimensional visualization/intelligent construction management platform/intelligent dam/left bank underground chamber ventilation and smoke dispersal thematic film/video surveillance system/material verification and finished concrete settlement system/digital slope construction management system/supervision bidding demonstration.
Xiluodu Hydroelectric Power Station
Customer : 川云水电/三峡传媒
Installation capacity : 1386万千瓦
Project time : 2019S-2008S
Applied Products : 技术支持/运营期安全监测分析系统/智能建造宣传片/施工方案多媒体演示/无线测温/地厂建设成果管理系统/施工监测与仿真分析系统/灌浆管理系统/施工管理系统/地厂岩锚梁施工动画...
Nuozhadu Hydroelectric Power Station
Customer : 昆明院/华能澜沧江
Installation capacity : 585万千瓦
Project time : 2014S-2010S
Applied Products : 安全预警系统/机电工艺篇演示/坝基处理、垫层施工可视化工法/坝料源开采施工可视化工法/石料填筑施工可视化工法/反滤料、掺砾石土料填筑工可视化工法/安全评价与预警信息管理系统...
Fengman Hydroelectric Power Station
Customer : 松花江水力发电
Installation capacity : 100.25万千瓦
Project time : 2016S-2014S
Applied Products : 安全监测系统/数字大坝一体化平台...